- 24X7 staffed for security
- 99.999% Guarantee on Electricity, Air Conditioning and Fire Prevention
- Provided by direct diesel-backed Piller rotary UPS systems that fully support the facility under maximum load with combination of continuous and short break supplies.
- 48 hours fuel capacity onsite with 24x7 fuel supply contract to be executed to increase operational time.
- Network connection with four major broadband suppliers (seeming-less fail-over to other providers if one connection fails)
- Offsite backup and redundant servers.
| ELECTRICAL |
|
|
AUTHORITY SUPPLY
|
Two (2) 33kV cable feeds from switching station with
two(2) 33/11kV transformers providing n+1 redundancy.
|

|
RETICULATION
|
11kV cabling reticulated to transformers on each level,
arranged in parallel redundant configuration. Cabling
originates from 11kV switchboards connected to direct
diesel coupled rotary UPS systems providing continuous
output for critical loads and short break output for
non-critical loads.
|
|
CAPACITY
|
IT power of up to 800 watts/m2 plus power for
air-conditioning plant with cable and transformer
capacity for 1000w/m2 on any floor
|
|
RELIABILITY
|
n+1 for all equipment including cable reticulation.
|
|
UPS AND STANDBY POWER GENERATION SYSTEM
|
Provided by direct diesel-backed Piller rotary UPS
systems that fully support the facility under maximum
load with combination of continuous and short break
supplies.
|

oC +/- 1oC. Relative humidity 50% +/- 10% at control instruments.
|
GENERATOR FUEL CAPACITY
|
48 hours fuel capacity onsite with 24x7 fuel supply
contract to be executed to increase operational time.
|
||
|
|
ENVIRONMENT | Constant 22 | |
|
HEATING, VENTILATING AND AIR CONDITIONING SYSTEM
|
Chilled water produced by water-cooled central chillers
in (n+1) configuration, circulated to down blow process
coolers in technical areas. Cooling towers located in
roof plantroom. HVAC System will use non- HCFC
refrigerants.
|
||
|
HEATING, VENTILATING AND AIR CONDITIONING FEATURES
|
On floor chilled water ring main served by three (3)
independent risers, each riser sized for 50% load at
maximum capacity.
|
||
|
CHILLERS
|
Three (3) Trane 4,500 kW
|
||

|
PROCESS COOLER
|
Process Coolers are Liebert, or as specified by tenants
|
||
|
CHILLER POWER SUPPLY
|
6.6 kV high voltage supply to each chiller.
|
||
|
CHILLER BACK UP POWER SUPPLY
|
Chillers provided with continuous power from
diesel-backed rotary UPS system.
|
||
|
REDUNDANCY FEATURES
|
n+1 for central chillers and cooling towers. On floor
process coolers to be n+1 as a minimum or a 125% load
at maximum capacity. Cooling tower water storage will
have a capacity of 48 hours of operation in the event
of mains failure. Water supply will also incorporate
dual connections to authorities main.
|
||
|
|
CABLING SYSTEM
|
Carriers permitted to install interior proprietary
cabling. Global Switch managed installations to
structured wiring plans and cable management practices.
|
|
|
|
FIRE SERVICES |
Three-stage fire detection system that maximises
detection
|
|

2 extinguishers on the technical floors.
|
FIRE SPRINKLERS
|
Double interlocked pre-action sprinkler system to the
technical areas, conventional wet pipe sprinkler system
to the ancillary areas. The double interlocked
pre-action sprinkler system requires a signal from the
detection system and a loss of air pressure in the
pipework due to the activation of a sprinkler before
the solenoid valve will activate and charge the
pipework with water.
|
||
|
SMOKE DETECTION
|
Multi-point aspirated smoke detection system to the
technical area and sub floor. Addressable point type
smoke detectors in the ancillary areas. The multi-point
aspirated smoke detection system will have three stages
of alarm.
Stage 1 (alert) - Alert signal to fire affected area and security to prompt investigation. Stage 2 (pre alarm) - Evacuation sounded in fire-affected area. Stage 3 (alarm) - NSWFB is called, gas discharges, detection system signals pre-action system. |
||
|
GAS SUPPRESSION SYSTEM
|
Centrally stored Inergen with risers to each technical
space. This allows tenants to enclose their area and
extend the gas pipework to provide local gas
suppression via directional valves.
|
||
|
FIRE EXTINGUISHERS
|
Fire extinguishers throughout the building with CO | ||
|
|
SECURITY SYSTEMS |
|
|
|
MANNED
|
24x7 staffed security.
|
||

|
CCTV
|
Full coverage of exterior, entryways, lifts, stairs and
site interior with LCD colour monitor screens. 28-day
digital system
|
||
|
ACCESS
|
Fully staffed security control room. Proximity access
control system for entrance, exit and lifts. All
tenanted areas have door access controls.
|
||
|
SITE ENTRANCE
|
Entrance barriers controlling vehicle entry. Personnel
access through revolving access doors via a security
personnel trap
|
||
|
ALARM SYSTEMS
|
Intrusion detection alarms will include perimeter and
internal door sensors, glass breakage sensors and
motion detectors for CCTV interlock.
|
||
|
|
WATER SUPPLY
|
Dual cold water connections from the authorities’
mains
|
|
|
COOLING TOWER WATER SUPPLY
|
A separate cooling tower water supply with feeds from
the primary water supply and from the secondary supply
consisting of a water storage tank that will have a
capacity of 12 hours of operation in the event of the
failure of both mains.
|
||
|
|
|
|
|
|
|
|
||
|
|
|
||